Upper Onondaga Park Playground Replacement

  • Project typeNew Playground
  • Project value+/- $350,000
  • Project scheduleComplete
  • Contractor nameDenzak Recreational Design & Supply | McGinnis Nelson Construction Inc.
Upper Onondaga Park Playground Rendering

Project Location: Upper Onondaga Park

Project Scope: The project will include the replacement and installation of an existing playground for a more inclusive playground.  

Funding Source: The project will be funded through $150,000 from NYS Assemblyman William Magnarelli and $200,000 of Parks capital funds.

Project Timeline: The timeline is subject to change due to contractor schedules, material availability and weather.

Construction Phase
Completion Date: Summer 2024

Questions? Email ParksPlanning@syr.gov

What's Here!

Slides:

  • Chameleon Slide Chameleon Spiral Slide L Slides (2)
  • Groove Slides (2) Hollow Log Slide Avalanche Slide

Total of 8 Slides Climbers:

  • Aquarius Rope/Net Climber Nature Canyon Climber Nature Tree-O-Climber Nature Sloped Climbing Wall (2)
  • Nature Bridge Tot Rock Climber
  • Trap Door Climber Wavy Wedge Wall Walker

Total of 9 Climbing Opportunities Other Activities:

  • ½ Calypso 2 Drum Panel
  • 4 Bay Arch Swings with 8 total seats (4 Belt Seats, 2 Tot Seats, 1 Generation Seat, 1 Inclusive Seat)
  • Alta Glide Flex
  • Post Mounted Bell Eagle Family Play Panel Fire Truck Wheel Panel Fun Fone Pair
  • Sensory Panel Hex/Triangle Sensory Panel Oval/Square Lookout Towers (2)
  • Pilot Panel with 2 Wheels Post Mounted Steering Wheel Wall with Wheel

Contact details

Parks Planning & Development
315-473-4330