Proposed park projects will include:
- A splashpad reconstruction for Washington Square Park, located at 101 Washington Square, 13208. The splash pad will include one vertical spray and multiple ground sprays. New bleachers will be installed at the existing basketball courts.
- A new two-bay swingset replacement for Union Park, located at 1001 N. Salina Street, 13208, along with the installation of new covered benches on the southeast side of the park.
- A multi-purpose events stage will be built at Demong Park, located at 300 Kirkpatrick Street, 13208.
- A Miracle Alta Inclusive Glider and two new shade structures are planned for Clinton Playlot, located at 399 North Crouse Ave, 13203.
- The installation of several outdoor fitness stations for McChesney Park, located at 2308 Grant Boulevard, 13208.
All projects are expected to be completed by fall 2024, based on weather and contractor availability.
The department is also proposing the re-use of existing fencing at Lincoln Park, located at 100 Robinson Street, 13203, to support a new fully enclosed dog park on the old baseball field. Neighbors are encouraged to email comments and questions to ParksPlanning@syr.gov by Friday, April 28, 2023.